Involvement on Past Projects:

Chicago, IL- Hilton Multi-Brand
(H2S, HGI, HAM)

Communication/Low Voltage Contractor for Structured Cabling of Multi Brand Hotel which occupies 23 total floors with 470 Guest Rooms.  Each floor provides guest rooms for each of the Brands.  Main Lobby contains check-in areas, club lobby and pantry area, as well as future tenant areas.  This space includes ten meeting rooms, pre-function area and administration offices.  Level 22 provides entertainment, a restaurant, bar and multipurpose space.  Lower levels consist of a business area, fitness area, pool, Starbucks coffee and dining space.  All common areas include background music and AV connections.  All Security and AV contracts were direct with the Owner on this project. 

Virgin Hotel Chicago

Delivered design build budgets during design intent for LV Systems while later assisting the Owners Design Team to assure all systems were accounted for as well as the coordination and implementation of systems with owner vendors. Elizabeth’s role included the installation of an Air Blown Fiber backbone (Structured Cabling/AV/Security/DAS) spanning 29 floors and 250 hotel rooms.  As well as the installation of Audio-Visual Systems for the Guest Rooms, Grand Ballroom, meeting rooms, Restaurant, Coffee Shop and Roof Top Bar with DJ/Stage inputs and capabilities.  Guest Rooms included ABF fiber to each independent Media Box, Multi Media Jack packs, speakers, guest sources, Incomm wiring and Guestroom Doorbell/DND devices.   Engineering and consulting services were provided while collaborating with Service Providers for a seamless installation and commissioning of a fully functional DAS System.  Networked based Security Systems coordination with Security Director to assure Main Security Command Station that  provides full access and viewing to all cameras.

City Front Plaza 52 story Loews Hotel and Residential Tower

Provided Design Build network-based Security, CCTV, Access Control, Intercom and Long-Range Reader and Centralized AV systems with Video Walls.  Loews occupies Floors 1-14 with 400 Guest Rooms, five Ballrooms, three Jr. Ballrooms, 24 Meeting Rooms, Restaurant, Bar and Amenities, while Floors 15-52 are Residential Living with high end amenities.  AV installation included networked video and audio by AVB and Dante Networks throughout. Bar and Amenities floors included outdoor televisions with combinable audio video zones.  Ballrooms and Jr. Ballrooms included the installation of Bus port retractable bus receptacle.  Networked based Security Systems coordination with Security Director to assure Main Security Command Station provides full access and viewing to all cameras.

Radisson Blu Hotel Chicago

The Radisson Blu Hotel was a complete Low Voltage Design Build project.  Including Cat6 structured cabling, fiber to each of the 334 guest rooms directly from the MDF and network based Lenel Security System.  As well as, a networked interfaced Audio-Visual System for six Meeting Rooms, Boardroom, Jr. Ballroom and Grand Ballroom.  Music throughout and a Video Wall consisting of nine 42” LCD screens.  Main Ballroom consisted of a divisible audio video system with divisible in one, two or three rooms.  Cross platform integration through Crestron control and Lutron lighting and Shades throughout the Ballroom.  Through the design process, we minimized the necessary total IDF’s to only two with an MDF, to reduce further expenses.  The design and installation of Distributed Antenna System including  cabling, terminations, fiber optic cabling, APC fiber splices, antennas and sweep tests.  Networked based Security Systems coordination with Security Director to assure Main Security Command Station provides full access and viewing to all cameras.  Installation of owner provided wireless access points were also included.

Chicago Hilton Home2 Suites

Completed Design, Specifications and Drawings for LV Systems while assisting the Owners Design Team to assure all systems were accounted for as well as the coordination and implementation of systems with owner vendors. Elizabeth’s responsibilities included the installation of all low voltage system (Structured Cabling/AV/Security/Switches/Phones, Etc.) spanning 19 floors and 210 hotel rooms ,as well as the installation of Audio-Visual Systems for the Common Areas, Dining, Fitness and Boardroom.  This project included engineering and consulting services while collaborating with Service Providers for a seamless installation and commissioning of a turnkey Hotel.  Responsibilities include the contract and installation of  Phone System & Voicemail, Admin & Guest Rooms phones, Business Center Terminals, Printers, switches, HSIA, Security and AV Systems and Hilton PMS implementation.as

Hampton Inn Bridgeview-Hilton

Completed Design, Specifications and Drawings for LV Systems while assisting the Ownership Team to assure all systems were accounted for as well as the coordination and implementation of systems with owner vendors. Responsibility included the installation of all low voltage system (Structured Cabling/AV/Security) spanning 4 floors and 109 hotel rooms.  , as well as the installation of Audio-Visual Systems for the Common Areas, Dining, Fitness and Meeting room. Implementing the engineering and consulting services while collaborating with Owner/Operator and vendors for a seamless installation and commissioning of a turnkey Hotel. 

Confidential Multi-Brand Hotel

Low Voltage Contractor for 31 story Multi-Brand Hotel including:  Structured Cabling, Audio Visual Systems and Security Systems (Access/CCTV/Intercom).  GPON Network Infrastructure Design, fiber to each guest room.  Security Systems are network based, including Biometric devices, to Main Security Command Station providing full access and viewing of entire system.  Audio/Visual system includes both indoor and outdoor design and functionality throughout 31 story building.

Riverside, Chicago, IL:

Building eABF Duraline Microduct Design with redundancy throughout the 54 story “Class A” office tower, 1.2 million sq. feet of tenant, amenties and restaurants adjoining a 1.5 acre park along the Riverwalk with outdoor Wireless Access Points and Distributed Anntenna Systems (DAS). Coordination with GC, MEP and Owner/Development Teams to assure there were no schedule delays.

110 N Wacker, Chicago, IL:

Similar To The 150 N Riverside Project, With The Same Construction Team, Building Eabf Duraline Microduct Design With Reduntancy Throughout The 55 Story “class A” Office Tower, 1.5 Million Sq. Feet Of Tenant, Amenties And World Class Restaurants Along The Riverwalk And Public Park. Coordination With Gc, Mep And Owner/development Teams To Assure There Were No Schedule Delays.

320 S Canal, Chicago, IL:

Similar To The 110 N Wacker Project, With The Same Construction Team, Building Eabf Duraline Microduct Design With Reduntancy Throughout The 50 Story “class A” Office Tower, 1.5 Million Sq. Feet Of Tenant, Amenties And World Class Restaurants Adjoining A 1.5 Acre Park With Direct Access To The Underground Pedway Connecting To Chicago’s Union Station. Coordination With Gc, Mep And Owner/development Teams To Assure There Were No Schedule Delays.